Rack2GW · Rack to Gigawatt机柜到吉瓦 · Rack2GW
Grow a 40 kW server closet into a 1 GW AI campus. Seven levels, grid-snapped building, airflow particles, heat/power/cost overlays.从 40 kW 小机房一路建到 1 GW AI 园区。七个关卡,网格吸附摆放设备,气流粒子、热力/电力/成本叠加图,中英双语。
Play →开始游戏 →DC Epoch机房纪元
Five rotatable 3D levels. Place, rotate and remove racks, cooling and power gear while PUE, redundancy and economics update live.五个关卡的可旋转 3D 场景,放置、旋转、拆除机柜与冷却电力设备,实时重算 PUE、冗余和成本收益。
Play →开始游戏 →Gigawatt Compute City 3D吉瓦算力城 3D
Start with $80K and a 4×4 room, scale to a 1 GW campus. Fall short on power or cooling and racks trip or overheat. Six stages, autosave.8 万美元起步,一间 4×4 小机房扩张到 1 GW 园区。供电制冷跟不上就断电过热,六个阶段,进度自动保存。
Play →开始游戏 →